<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/">
<channel>
<title>Rice Puller - Premium Fund Available in Kolkata</title>
<link>https://rice-puller.com/</link>
<description>Discuss anything and everything about Rice Pullers and all other related items.</description>
<language>en</language>
<item>
<title>Premium Fund Available in Kolkata</title>
<content:encoded><![CDATA[<p>Trade Premium Work by Upper Medium Company<br />
Date:-<br />
(NEW CURRENCY ONLY)<br />
Place:Kolkata.<br />
Company to Company</p>
<p><br />
(Date and Time Details will be filled by the Company and B party should fill the rest)<br />
Company will acknowledge the terms sheet and sign to confirm transaction. If it is OK with<br />
B party then it will be final. There will be minimum period of 2/3 working days between the<br />
B party signing and actual execution of transaction.<br />
A day before escrow B Party book 2rooms in any hotel near to the escrow location and share<br />
the receipt with A party consultant before reaching company people in escrow location.<br />
B party has been made aware and has understood the period requirement of 2/3 working<br />
days for which there will not be any change.<br />
If due to any reason any party failed to do escrow on mentioned date they have to give<br />
penalty of 50lacs.(Ie: if A Party failed they give penalty to B Party, if B Party failed they give<br />
penalty to A Party).<br />
DAY BEFORE TRANSACTION:-<br />
Escrow of 25Lacs (New Currency) in any 3/5 Star Hotel ( A-party and B-party). Prior to<br />
working day, for which the time will be decided by the company. Company will book the<br />
hotel room with locker near location provided by the B party. After verify of escrow amount,<br />
both party will (Only) show their kyc and not exchange the hardcopy with each other.<br />
ON TRANSACTION DAY:<br />
1) At 10.00 am Company representative will arrive at meeting point, within 1 km from B<br />
party cash location. Location to be confirmed by B party at the time of Booking.<br />
Company Representative will show Group Lead Company’s Authorization Letter, Bank<br />
statement &amp; Personal ID of Authorized Person at meeting point.<br />
At location / place which is not under any kind of CCTV surveillance. Both the parties have<br />
to reach cash location by 10. 30 am.<br />
(On or before 11:00 B party should show the new currency.)<br />
Time will not be extended.<br />
(Next 1hr i.e. 10:30 to 11:30 is for primary Quantity / Quality checking.)<br />
2) B Party to give and assure the confirmation that the proposed passage / path / location /<br />
place where everyone is proceeding, is not under any kind of CCTV surveillance.<br />
At any time Company representative will find anything is out of the term sheet, they will<br />
have right to treat as non-compliance of the terms, resulting in cancellation of transaction<br />
and security amount will be forfeited. Company representatives’ decision will be final, if any<br />
kind of violation of term sheet.<br />
3) Company representative will do primary check of quantity / quality and ONLY after they<br />
are satisfied they will call the counting team. Counting team will come along with Bank<br />
Statement<br />
&amp; KYC of Executing Company, which will be group / associate Company.<br />
(No copy / Photo will be allowed)<br />
4) After seeing the Bank statement and KYC, B Party shall give their confirmation within 30<br />
mins. After B party give their acceptance counting team will start Quantity &amp; Quality<br />
Checking. After the complete Q &amp; Q satisfaction, Bank transfer / RTGS will be given to the<br />
account whose details are given by B party along with B party media commission.<br />
5) After verification of Bank transfer / RTGS by B Party, Company will make physical<br />
movement of the Cash. After the physical movement Company will give donation / no claim<br />
letter, as may be required.<br />
NOTE :-----<br />
a) B Party should organize / execute necessary Paper work to establish their eligibility to<br />
receive funds.<br />
b) Any delay in time schedule of execution and short fall in display of same amount of<br />
quantum of cash will be treated as non-compliance of the terms, resulting in cancellation of<br />
transaction and security amount will be forfeited.<br />
c) No claim for any refund will be entertained,No further discussion will be allowed.<br />
d) No stage(s) of transaction will not be carried at places covered under any kind of<br />
surveillance including CCTV.<br />
e) Any of the following locations are not acceptable for execution. - Residential /owner<br />
residence cum office, narrow street, crowded area, bank, religious place, upper floor,<br />
Government building, hotel.<br />
f) Extension of time will not be given to any party in any circumstances.<br />
List of Documentation submitted by B party in the time of Agreement between A &amp; B)<br />
Documents Produce by W Party:-<br />
Authorization Letter<br />
Fund Proof (Statement)<br />
Balance Sheet<br />
Board Resolution Letter<br />
Memorandum of Article<br />
Registered Incorporation Cirtificate<br />
Company Pan Copy<br />
Company Tan Copy<br />
ITR 3 Years<br />
Audit Report<br />
No Claim Letter (To be given after transaction)<br />
Willingness Letter (In Back Dated)<br />
Documents Produce by B Party<br />
Registration of Company.<br />
Noc from all Directors.<br />
Heavy Bank Transaction.<br />
RBI/CA approved project.<br />
Pan Card Company &amp; Director's.<br />
Letter heads, stamp &amp; Comp authorization.<br />
Self id card.<br />
Auditor report for fund receiving capacity in a/c.<br />
Bank Letter for Fund Receiving Capacity<br />
Above terms and condition are read and understood.Signed as a token of acceptance of the<br />
above terms.</p>
]]></content:encoded>
<link>https://rice-puller.com/index.php?id=147585</link>
<guid>https://rice-puller.com/index.php?id=147585</guid>
<pubDate>Mon, 08 Jan 2018 13:49:27 +0000</pubDate>
<category>General</category><dc:creator>Search2</dc:creator>
</item>
</channel>
</rss>
